Blue Bird Qbre 1998
Model Qbre made in 1998 by Blue Bird got 7 service bulletins. Technical service bulletines regarding power train, service brakes, air.
Model 1998
Bulletins
Bulletin | Bulletin date | Replacement Bulletin | Item no. | Summary | Added |
---|---|---|---|---|---|
POWER TRAIN - AUTOMATIC TRANSMISSION - COOLING UNIT AND LINES | |||||
S00DQ | 02/15/2001 | 622567 | Service bulletin regarding allison retarder cooler and accumulator hose leaking condition. *tt | 10/19/2001 | |
S00DQ | 02/15/2001 | 620091 | Service bulletin regarding the cooler and accumulator hoses leaking through the cover on allison retarder transmission on 1997 - 1999 year model tcre, csre and qbre series buses equipped with allison retarder transmissions. * | 07/12/2001 | |
SERVICE BRAKES, AIR - ANTILOCK | |||||
S01EN | 04/23/2001 | 621688 | This bulletin states that on certain coaches, a rubbing potential exist concerning the top most fitting on the r12dc relay valve. *tt | 09/28/2001 | |
S01EN | 04/23/2001 | 621690 | Service bulletin summary regarding rd12 relay valve relocation. *tt | 09/28/2001 | |
S01EN | 04/22/2001 | 621684 | Letter to north american distributors regarding r12dc relay valve relocation. *tt | 09/28/2001 | |
S01EN | 04/23/2001 | 621686 | Letter to blue bird owners regarding relocation of the r12dc relay valve to prevent the top fitting from rubbing the floor on certain floor plans ofcertain model rear engine buses with ridewell suspension and air brakes equipped with antilo | 09/28/2001 | |
S01EN | 04/23/2001 | 620547 | On 1998 - 2000 tcre, scre, csre and qbre products a rubbing potential exist concerning the top most fitting on the r12dc relay valve. with certain floor plans the valve will rub against the floor crossmember eventually causing a leak at t | 08/14/2001 |